Commit Graph

1 Commits

Author SHA1 Message Date
Ho Ngoc Hai
505455b6f8 docs: add production readiness checklist and sign-off document
Comprehensive 12-item production readiness assessment covering:
- Load testing, security, monitoring, backups, incident response
- Database schema freeze, CI/CD, E2E tests, performance benchmarks
- SSL/TLS, DNS, CDN infrastructure readiness

Identified 5 critical blockers and 1 high-priority blocker with
assigned owners and required actions for each.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-12 00:14:57 +07:00