Files
goodgo-platform/IMPLEMENTATION_PLAN.md
Ho Ngoc Hai a53c1f016f docs: add Phase 4-5 production hardening and quality polish roadmap
Comprehensive audit identified 24 improvements across security,
performance, testing, frontend, and infrastructure. Created 12
Paperclip issues (TEC-1449 through TEC-1461) covering critical
JWT fix, deployment pipeline, HMAC timing, test coverage gaps,
and documentation.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-08 04:03:01 +07:00

5.4 KiB

GoodGo Platform AI — Implementation Plan

Last Updated: 2026-04-08


Milestones

Milestone 1: Walking Skeleton (Phase 0)

Goal: Any engineer can clone, install, and start developing.

Execution Order:

  1. [TEC-1415] Monorepo Scaffolding + [TEC-1416] Docker Compose (parallel — no deps)
  2. [TEC-1420] ESLint/Prettier (after F1)
  3. [TEC-1417] Prisma Schema (after F1 + F2)
  4. [TEC-1418] Shared Module (after F1)
  5. [TEC-1419] CI/CD Pipeline (after F1)
F1 (Monorepo) ──┬── F6 (Lint/Prettier)
                 ├── F3 (Prisma Schema) ←── F2 (Docker)
                 ├── F4 (Shared Module)
                 └── F5 (CI/CD)
F2 (Docker) ─────┘

Milestone 2: Core Product (Phase 1)

Goal: Users can register, post listings, and search properties.

Execution Order:

  1. [TEC-1421] Auth Backend (after F3, F4)
  2. [TEC-1425] Security Hardening + [TEC-1426] Error Handling (parallel, after F1/F4)
  3. [TEC-1422] Auth Frontend (after C1)
  4. [TEC-1423] Listings Backend (after C1)
  5. [TEC-1424] Search Backend (after C3)
  6. [TEC-1427] Listings Frontend (after C3)
  7. [TEC-1428] Search + Landing Frontend (after C5)
F3 + F4 ──→ C1 (Auth BE) ──┬── C2 (Auth FE)
                            ├── C3 (Listings BE) ──┬── C5 (Search BE) ──→ C6 (Search FE)
                            │                      └── C4 (Listings FE)
                            ├── X1 (Security)
                            └── X3 (Error Handling)

Milestone 3: Monetization (Phase 2)

Goal: Revenue-generating MVP with payments, subscriptions, and admin tools.

C1 ──→ M1 (Payments) ──→ M2 (Subscriptions)
C1 ──→ M3 (Notifications)
C1 + C3 ──→ M4 (Admin)
Phase 1 ──→ X4 (E2E Tests)

Milestone 4: AI-Powered (Phase 3)

Goal: Differentiated product with AI features.

F2 ──→ A1 (AI/ML Container) ──→ A2 (Analytics)
C5 + A2 ──→ A3 (MCP Servers)

Dependency Map

Task Depends On
TEC-1415 (F1) None
TEC-1416 (F2) None
TEC-1417 (F3) F1, F2
TEC-1418 (F4) F1
TEC-1419 (F5) F1
TEC-1420 (F6) F1
TEC-1421 (C1) F3, F4
TEC-1422 (C2) C1
TEC-1423 (C3) C1, F3
TEC-1424 (C5) C3, F2
TEC-1425 (X1) F1
TEC-1426 (X3) F4
TEC-1427 (C4) C3
TEC-1428 (C6) C5
TEC-1429 (M1) C1
TEC-1430 (M2) M1
TEC-1431 (M3) C1
TEC-1432 (M4) C1, C3
TEC-1433 (X4) Phase 1

Milestone 5: Production Hardening (Phase 4)

Goal: Fix all critical security issues. Establish production deployment capability.

Execution Order:

  1. [TEC-1449] JWT Secret Fix + [TEC-1451] HMAC Timing Fix + [TEC-1452] MinIO Fix + [TEC-1453] CSRF (parallel — no deps between them)
  2. [TEC-1455] DB Index (independent — can run parallel with above)
  3. [TEC-1450] Deployment Pipeline (after security fixes verified)
  4. [TEC-1457] Backups + Logs (after deployment infra exists)
  5. [TEC-1456] Test Coverage (parallel — independent of infra)
TEC-1449 (JWT) ──────┐
TEC-1451 (HMAC) ─────┤
TEC-1452 (MinIO) ────┼──→ TEC-1450 (Deploy Pipeline) ──→ TEC-1457 (Backups + Logs)
TEC-1453 (CSRF) ─────┘
TEC-1455 (DB Index) ──────────────────────────────────(independent)
TEC-1456 (Tests) ─────────────────────────────────────(independent)

Milestone 6: Quality & Polish (Phase 5)

Goal: Production-quality UX, documentation, and performance.

Phase 4 done ──→ TEC-1458 (Redis Caching)
                 TEC-1459 (Frontend Polish)    (parallel)
                 TEC-1460 (OpenAPI/Swagger)    (parallel)
                 TEC-1461 (Documentation)      (parallel)

Dependency Map (Phase 4-5)

Task Depends On
TEC-1449 None
TEC-1450 TEC-1449 (security first)
TEC-1451 None
TEC-1452 None
TEC-1453 None
TEC-1455 None
TEC-1456 None
TEC-1457 TEC-1450
TEC-1458 Phase 4
TEC-1459 None
TEC-1460 None
TEC-1461 None

Rollout Notes

  • Phase 0-3 complete — 23/23 tasks done
  • Phase 4 is immediate priority — security fixes must land before any production deployment
  • TEC-1449 (JWT) is the single most critical fix — blocks production deployment
  • Security tasks (TEC-1449, 1451, 1452, 1453) can all run in parallel — assign to Security Engineer + Senior Backend
  • TEC-1450 (Deployment Pipeline) should start after security fixes — no point deploying insecure code
  • TEC-1456 (Tests) and TEC-1455 (DB Index) are independent — can run anytime
  • Phase 5 tasks are all independent — can run fully in parallel once Phase 4 is done
  • Critical path: TEC-1449 → TEC-1450 → TEC-1457 (security → deploy → observability)