Files
goodgo-platform/PROJECT_TRACKER.md
Ho Ngoc Hai 08d84a56a3 docs: update PROJECT_TRACKER.md — all 51 tasks complete across 6 phases
Synced tracker with Paperclip issue statuses. All Phase 4-6 tasks
(security hardening, quality, feature completion) confirmed done.
Platform is MVP-ready for launch review.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-10 18:31:56 +07:00

9.3 KiB

GoodGo Platform AI — Project Tracker

Last Updated: 2026-04-10 Project: Goodgo Platform AI Status: ALL PHASES COMPLETE — MVP Ready for Launch Review


Phase 0: Foundation (P0 — Critical)

Issue Title Priority Status Commit
TEC-1415 Monorepo Scaffolding (Turborepo + NestJS + Next.js) Critical done e1e5fa6
TEC-1416 Docker Compose Dev Environment Critical done e1e5fa6
TEC-1417 Prisma Schema + Initial Migration + Seed Scripts Critical done ff358f6
TEC-1418 Shared Module (Domain Primitives + Infrastructure) Critical done 1fb7bb3
TEC-1419 CI/CD Pipeline (GitHub Actions) High done 19dd59e
TEC-1420 ESLint + Prettier + Module Boundary Rules High done 83d55de

Phase 1: Core Auth & Listings (P1)

Issue Title Priority Status Commit
TEC-1421 Auth Module Backend (Register, Login, JWT, OAuth) Critical done 391c040
TEC-1422 Auth Frontend (Login/Register + OAuth) High done bfdd2f7
TEC-1423 Listings Module Backend (CRUD, Media, Moderation) High done 8a33aae
TEC-1424 Search Module Backend (Typesense + Geo) High done 6741592
TEC-1425 Security Hardening (Rate Limiting, CORS, Helmet) High done f3081d9
TEC-1426 Error Handling & Logging Strategy High done c981bff
TEC-1427 Listings Frontend (Create/Edit + Detail) High done 207a201
TEC-1428 Search + Landing Page Frontend High done 5e44456

Phase 2: Monetization & Operations (P2)

Issue Title Priority Status Commit
TEC-1429 Payments Module (VNPay + MoMo + ZaloPay) Medium done ad77139
TEC-1430 Subscriptions Module (Plans, Quotas, Billing) Medium done 9b581b7
TEC-1431 Notifications Module (Email, SMS, Zalo OA, FCM) Medium done 0b29fac
TEC-1432 Admin Module (Backend + Frontend) Medium done 6123fc4
TEC-1433 E2E Testing Setup (Playwright) Medium done 60a0b3c

Phase 3: AI & Advanced (P3)

Issue Title Priority Status Commit
Analytics Module (Market Reports, Price Index) High done efa49e2
AI/ML Services Container (Python FastAPI + XGBoost) High done b392bc3
MCP Server Integration (Property Search, Analytics, Valuation) Medium done cb00b12
Performance Monitoring (Prometheus + Grafana) Low done d99dfba

Phase 4: Production Hardening (P0/P1 — Security + Infrastructure)

Issue Title Priority Status Assignee
TEC-1449 Fix JWT hardcoded fallback secret Critical done Security Engineer
TEC-1450 Create production deployment pipeline — Dockerfiles + CI/CD Critical done DevOps Engineer
TEC-1451 Fix timing-unsafe HMAC in payment verification High done Security Engineer
TEC-1452 Fix MinIO hardcoded credentials and unsigned PUT High done Senior Backend Eng
TEC-1453 Add CSRF protection middleware High done Security Engineer
TEC-1455 Add missing DB index on Listing.sellerId High done Database Architect
TEC-1456 Add unit tests for Analytics, Search, Notifications High done QA Engineer
TEC-1457 Set up database backup strategy and log aggregation High done SRE Engineer

Phase 5: Quality & Polish (P2 — UX, Docs, Performance)

Issue Title Priority Status Assignee
TEC-1458 Implement Redis caching layer for hot queries Medium done Senior Backend Eng
TEC-1459 Add error boundaries, 404 page, loading states, SEO metadata Medium done Senior Frontend Eng
TEC-1460 Add OpenAPI/Swagger documentation for API Medium done API Architect
TEC-1461 Create README.md and deployment documentation Medium done Technical Writer

Phase 6: MVP Feature Completion & Audit Follow-up (P0-P2)

Issue Title Priority Status Assignee
TEC-1592 Commit 23 untracked files (analytics, encryption, i18n) Critical done Senior Backend Engineer
TEC-1593 Investigate and fix Architect agent error status High done DevOps Engineer
TEC-1594 Consolidate i18n routes — remove non-locale route duplication High done Senior Frontend Engineer
TEC-1595 Build Agent Portal — inquiry system, lead tracking, quality High done Senior Backend Engineer
TEC-1596 Integrate AI/ML services — AVM endpoint, AI moderation High done Senior Backend Engineer
TEC-1597 Complete payment flow — VNPay E2E + MoMo integration High done Senior Backend Engineer
TEC-1598 Add post-deploy smoke test pipeline stage High done DevOps Engineer
TEC-1599 Add test coverage for health, mcp, metrics modules Medium done QA Engineer
TEC-1600 Generate OpenAPI/Swagger documentation Medium done Technical Writer
TEC-1601 Run K6 baseline load tests and establish benchmarks Medium done SRE Engineer
TEC-1602 Security audit — pen testing on auth and payment flows Medium done Security Engineer
TEC-1603 Database index optimization review Medium done Database Architect
TEC-1604 Setup Sentry error tracking integration Medium done Infrastructure Engineer
TEC-1639 Add auth guards to MCP Transport Controller Critical done Security Engineer
TEC-1640 Improve async error handling in critical modules High done Senior Backend Engineer
TEC-1641 Add input size limits for file uploads High done Senior Backend Engineer

Summary

Phase Total Done In Progress Todo
Phase 0 6 6 0 0
Phase 1 8 8 0 0
Phase 2 5 5 0 0
Phase 3 4 4 0 0
Phase 4 8 8 0 0
Phase 5 4 4 0 0
Phase 6 16 16 0 0
Total 51 51 0 0