GoodGo Platform AI — Project Tracker
Last Updated: 2026-04-12
Project: Goodgo Platform AI
Status: MVP Complete — Phase 7 (Post-MVP Improvements) Wave 14 ✅ Build Green
Phase 0: Foundation (P0 — Critical)
| Issue |
Title |
Priority |
Status |
Commit |
| TEC-1415 |
Monorepo Scaffolding (Turborepo + NestJS + Next.js) |
Critical |
done |
e1e5fa6 |
| TEC-1416 |
Docker Compose Dev Environment |
Critical |
done |
e1e5fa6 |
| TEC-1417 |
Prisma Schema + Initial Migration + Seed Scripts |
Critical |
done |
ff358f6 |
| TEC-1418 |
Shared Module (Domain Primitives + Infrastructure) |
Critical |
done |
1fb7bb3 |
| TEC-1419 |
CI/CD Pipeline (GitHub Actions) |
High |
done |
19dd59e |
| TEC-1420 |
ESLint + Prettier + Module Boundary Rules |
High |
done |
83d55de |
Phase 1: Core Auth & Listings (P1)
Phase 2: Monetization & Operations (P2)
| Issue |
Title |
Priority |
Status |
Commit |
| TEC-1429 |
Payments Module (VNPay + MoMo + ZaloPay) |
Medium |
done |
ad77139 |
| TEC-1430 |
Subscriptions Module (Plans, Quotas, Billing) |
Medium |
done |
9b581b7 |
| TEC-1431 |
Notifications Module (Email, SMS, Zalo OA, FCM) |
Medium |
done |
0b29fac |
| TEC-1432 |
Admin Module (Backend + Frontend) |
Medium |
done |
6123fc4 |
| TEC-1433 |
E2E Testing Setup (Playwright) |
Medium |
done |
60a0b3c |
Phase 3: AI & Advanced (P3)
| Issue |
Title |
Priority |
Status |
Commit |
| — |
Analytics Module (Market Reports, Price Index) |
High |
done |
efa49e2 |
| — |
AI/ML Services Container (Python FastAPI + XGBoost) |
High |
done |
b392bc3 |
| — |
MCP Server Integration (Property Search, Analytics, Valuation) |
Medium |
done |
cb00b12 |
| — |
Performance Monitoring (Prometheus + Grafana) |
Low |
done |
d99dfba |
Phase 4: Production Hardening (P0/P1 — Security + Infrastructure)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1449 |
Fix JWT hardcoded fallback secret |
Critical |
done |
Security Engineer |
| TEC-1450 |
Create production deployment pipeline — Dockerfiles + CI/CD |
Critical |
done |
DevOps Engineer |
| TEC-1451 |
Fix timing-unsafe HMAC in payment verification |
High |
done |
Security Engineer |
| TEC-1452 |
Fix MinIO hardcoded credentials and unsigned PUT |
High |
done |
Senior Backend Eng |
| TEC-1453 |
Add CSRF protection middleware |
High |
done |
Security Engineer |
| TEC-1455 |
Add missing DB index on Listing.sellerId |
High |
done |
Database Architect |
| TEC-1456 |
Add unit tests for Analytics, Search, Notifications |
High |
done |
QA Engineer |
| TEC-1457 |
Set up database backup strategy and log aggregation |
High |
done |
SRE Engineer |
Phase 5: Quality & Polish (P2 — UX, Docs, Performance)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1458 |
Implement Redis caching layer for hot queries |
Medium |
done |
Senior Backend Eng |
| TEC-1459 |
Add error boundaries, 404 page, loading states, SEO metadata |
Medium |
done |
Senior Frontend Eng |
| TEC-1460 |
Add OpenAPI/Swagger documentation for API |
Medium |
done |
API Architect |
| TEC-1461 |
Create README.md and deployment documentation |
Medium |
done |
Technical Writer |
Phase 6: MVP Feature Completion & Audit Follow-up (P0-P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1592 |
Commit 23 untracked files (analytics, encryption, i18n) |
Critical |
done |
Senior Backend Engineer |
| TEC-1593 |
Investigate and fix Architect agent error status |
High |
done |
DevOps Engineer |
| TEC-1594 |
Consolidate i18n routes — remove non-locale route duplication |
High |
done |
Senior Frontend Engineer |
| TEC-1595 |
Build Agent Portal — inquiry system, lead tracking, quality |
High |
done |
Senior Backend Engineer |
| TEC-1596 |
Integrate AI/ML services — AVM endpoint, AI moderation |
High |
done |
Senior Backend Engineer |
| TEC-1597 |
Complete payment flow — VNPay E2E + MoMo integration |
High |
done |
Senior Backend Engineer |
| TEC-1598 |
Add post-deploy smoke test pipeline stage |
High |
done |
DevOps Engineer |
| TEC-1599 |
Add test coverage for health, mcp, metrics modules |
Medium |
done |
QA Engineer |
| TEC-1600 |
Generate OpenAPI/Swagger documentation |
Medium |
done |
Technical Writer |
| TEC-1601 |
Run K6 baseline load tests and establish benchmarks |
Medium |
done |
SRE Engineer |
| TEC-1602 |
Security audit — pen testing on auth and payment flows |
Medium |
done |
Security Engineer |
| TEC-1603 |
Database index optimization review |
Medium |
done |
Database Architect |
| TEC-1604 |
Setup Sentry error tracking integration |
Medium |
done |
Infrastructure Engineer |
| TEC-1639 |
Add auth guards to MCP Transport Controller |
Critical |
done |
Security Engineer |
| TEC-1640 |
Improve async error handling in critical modules |
High |
done |
Senior Backend Engineer |
| TEC-1641 |
Add input size limits for file uploads |
High |
done |
Senior Backend Engineer |
Phase 7: Post-MVP Improvements & Production Hardening (P0-P2)
Wave 1 — Critical Bug Fixes
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1647 |
Fix Reviews module routing — all /reviews/* routes return 404 |
Critical |
done |
Senior Backend Engineer |
| TEC-1648 |
Fix Health check endpoints — /health and /ready return 404 |
Critical |
done |
Senior Backend Engineer |
| TEC-1649 |
Verify and fix Login error handling — 500 → 401 |
Critical |
done |
Senior Backend Engineer |
| TEC-1650 |
Fix Listing detail — non-existent ID returns 500 → 404 |
High |
todo |
Senior Backend Engineer |
Wave 2 — Production Readiness
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1651 |
Setup Docker Compose CI environment for E2E tests |
High |
done |
DevOps Engineer |
| TEC-1652 |
Run and verify all 29 E2E tests with full environment |
High |
todo |
QA Engineer |
| TEC-1653 |
Security headers audit — CSP, HSTS, X-Frame-Options |
High |
done |
Security Engineer |
| TEC-1658 |
Add PgBouncer connection pooling for production |
High |
done |
Database Architect |
Wave 3 — User-Facing Quality
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1654 |
Mobile responsive optimization |
High |
done |
Senior Frontend Engineer |
| TEC-1655 |
SEO optimization — structured data, sitemap, meta tags |
High |
done |
Senior Frontend Engineer |
| TEC-1656 |
Add per-user rate limiting for authenticated API routes |
High |
done |
Security Engineer |
| TEC-1657 |
Add audit logging for admin actions |
High |
todo |
Senior Backend Engineer |
Wave 4 — Engineering Excellence
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1659 |
Add graceful degradation for Typesense and Redis failures |
Medium |
done |
Architect |
| TEC-1660 |
Document all structured API error codes |
Medium |
done |
Technical Writer |
| TEC-1661 |
Setup RUM and Core Web Vitals tracking |
Medium |
done |
SRE Engineer |
| TEC-1662 |
Update QA_TRACKER.md — correct test counts and bug statuses |
Medium |
done |
QA Engineer |
Wave 5 — CEO Audit: Security & Quality
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1684 |
Fix critical npm vulnerabilities (axios SSRF, Next.js CVEs) |
Critical |
done |
Security Engineer |
| TEC-1685 |
Fix lint error in resilient-search.repository.ts |
High |
done |
QA Engineer |
| TEC-1686 |
Increase test coverage for listings, auth, search to 50%+ |
High |
done |
QA Engineer |
| TEC-1687 |
Set up Dependabot for automated security updates |
Medium |
done |
DevOps Engineer |
| TEC-1688 |
Implement Saved Searches + Alerts (Sprint 3 gap) |
High |
done |
Architect |
Wave 6 — CEO Audit: Code Hygiene, Frontend Quality, Features
Wave 6A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1692 |
Commit 348 uncommitted files — protect work from data loss |
Critical |
done |
Senior Backend Engineer |
| TEC-1693 |
Fix 729 ESLint errors — unblock CI pipeline |
Critical |
done |
Senior Backend Engineer |
| TEC-1694 |
Create /pricing page — complete subscription funnel |
Critical |
todo |
Senior Frontend Engineer |
Wave 6B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1695 |
Frontend accessibility audit + ARIA fixes |
High |
todo |
Senior Frontend Engineer |
| TEC-1696 |
Fix Reviews test + increase frontend test coverage to 40% |
High |
todo |
QA Engineer |
| TEC-1697 |
Mobile responsive polish — final pass on all 22 pages |
High |
todo |
UX/UI Designer |
Wave 6C — Medium Priority (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1698 |
Frontend performance — next/image + Server Component audit |
Medium |
in_progress |
Senior Frontend Engineer |
| TEC-1699 |
Saved search email alerts — user retention feature |
Medium |
todo |
Senior Backend Engineer |
Wave 7 — CEO Audit (2026-04-10)
Wave 7A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1703 |
Fix HashedPassword.vo.spec.ts timeout — restore CI green |
Critical |
done |
QA Engineer |
Wave 7B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1704 |
Vietnamese price formatting — display 3.5 tỷ, 150 triệu/m² |
High |
todo |
Senior Frontend Engineer |
| TEC-1705 |
Consolidate 18 audit files from root into docs/audits/ |
High |
todo |
Technical Writer |
Wave 7C — Medium Priority (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1706 |
Build property comparison page — frontend for MCP compare |
Medium |
todo |
Senior Frontend Engineer |
| TEC-1707 |
Create agent public profile page at /agents/[id] |
Medium |
todo |
Senior Frontend Engineer |
| TEC-1708 |
Add lightbox image gallery to property detail page |
Medium |
todo |
Senior Frontend Engineer |
| TEC-1709 |
Create Grafana dashboard for API latency monitoring |
Medium |
todo |
SRE Engineer |
| TEC-1710 |
Automate database backup restore verification |
Medium |
todo |
Database Architect |
| TEC-1711 |
Consolidate project documentation — update README + API docs |
Medium |
todo |
Technical Writer |
Wave 8 — CEO Audit: Code Hygiene, Backend Hardening, Quality (2026-04-11)
Wave 8A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1733 |
Fix 2 TypeScript errors in OAuth callback tests |
Critical |
todo |
QA Engineer |
| TEC-1734 |
Fix 9 remaining ESLint errors across web and e2e |
Critical |
todo |
Senior Frontend Engineer |
| TEC-1735 |
Commit all 56 uncommitted changes |
Critical |
todo |
Senior Backend Engineer |
Wave 8B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1736 |
Add error handling to remaining backend CQRS handlers |
High |
todo |
Senior Backend Engineer |
| TEC-1737 |
Increase backend test coverage for admin, leads, inquiries, reviews |
High |
todo |
QA Engineer |
| TEC-1738 |
Add cascade delete to Prisma foreign keys |
High |
todo |
Database Architect |
| TEC-1739 |
Add per-endpoint API rate limiting with Redis sliding window |
High |
todo |
Security Engineer |
Wave 8C — Medium/Low Priority (P2/P3)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1740 |
DTO validation hardening — phone format, password strength |
Medium |
todo |
Senior Backend Engineer |
| TEC-1741 |
Create operational runbook for production incidents |
Medium |
todo |
SRE Engineer |
| TEC-1742 |
Frontend image optimization — next/image responsive sizes |
Medium |
todo |
Senior Frontend Engineer |
| TEC-1743 |
Create one-command bootstrap dev setup script |
Low |
todo |
DevOps Engineer |
Wave 8 Status Updates
| Issue |
Title |
Priority |
Status |
Notes |
| TEC-1693 |
Fix 729 ESLint errors |
Critical |
done |
Fixed in 0593d40 |
| TEC-1734 |
Fix 9 remaining ESLint errors |
Critical |
done |
Fixed in 0593d40 |
| TEC-1738 |
Add cascade delete to Prisma FKs |
High |
done |
Fixed in 45e48c0 |
| TEC-1739 |
Per-endpoint API rate limiting |
High |
done |
Fixed in d824d16 |
| TEC-1741 |
Operational runbook |
Medium |
done |
Fixed in f27b13f |
| TEC-1743 |
One-command bootstrap dev setup |
Low |
done |
Fixed in b7f9664 |
Phase 7 — Wave 9: CEO Audit (2026-04-11)
Wave 9A — Critical / High Priority (P0/P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1774 |
Fix 2 TypeScript compile errors blocking CI typecheck |
Critical |
done |
Senior Backend Engineer |
| TEC-1735 |
Commit 105 uncommitted file changes |
Critical |
done |
Senior Backend Engineer |
| TEC-1775 |
Add unit tests for MCP, Inquiries, and Leads modules |
High |
done |
QA Engineer |
| TEC-1736 |
Add error handling to remaining backend CQRS handlers |
High |
done |
Senior Backend Engineer |
Wave 9B — Medium Priority (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1776 |
Refactor 3 oversized files exceeding 220 LOC |
Medium |
todo |
Senior Backend Engineer |
| TEC-1777 |
Implement agent quality score auto-calculation cron |
Medium |
todo |
Senior Backend Engineer |
| TEC-1778 |
Add staging environment auto-deploy pipeline |
Medium |
done |
DevOps Engineer |
| TEC-1740 |
DTO validation hardening |
Medium |
todo |
Senior Backend Engineer |
| TEC-1699 |
Implement saved search email alerts |
Medium |
done |
Senior Backend Engineer |
| TEC-1708 |
Add lightbox image gallery to property detail |
Medium |
done |
Senior Frontend Engineer |
Wave 10 — CEO Audit (2026-04-11) — Automated Routine
Wave 10A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1839 |
Commit 105 uncommitted files + Fix 2 TS compile errors |
Critical |
done |
Senior Backend Engineer |
Wave 10B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1840 |
Add unit tests for Agents, Inquiries, Leads, Reviews modules |
High |
done |
QA Engineer |
| TEC-1841 |
Fix login endpoint returning 500 instead of 401 |
High |
done |
Senior Backend Engineer |
| TEC-1736 |
Add error handling to remaining CQRS handlers |
High |
done |
Senior Backend Engineer |
| TEC-1846 |
Build Inquiry & Lead Management UI for Agent Portal |
High |
done |
Senior Frontend Engineer |
| TEC-1848 |
Create production runbook, alerting rules & DR validation |
High |
done |
SRE Engineer |
| TEC-1849 |
Expand K6 load test coverage: search, admin, MCP endpoints |
High |
done |
SRE Engineer |
Wave 10C — Medium Priority (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1842 |
Refactor Agents/Inquiries/Leads/Reviews to full DDD |
Medium |
in_progress |
Architect |
| TEC-1777 |
Implement agent quality score auto-calculation cron |
Medium |
todo |
Senior Backend Engineer |
| TEC-1778 |
Add staging environment auto-deploy pipeline |
Medium |
done |
DevOps Engineer |
| TEC-1699 |
Implement saved search email alerts |
Medium |
done |
Senior Backend Engineer |
| TEC-1708 |
Add lightbox image gallery to property detail page |
Medium |
done |
Senior Frontend Engineer |
Wave 11 — CEO Audit (2026-04-11) — Automated Routine
Wave 11A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1876 |
Fix 9 ESLint errors — consistent-type-imports + unused vars |
Critical |
done |
Senior Backend Engineer |
| TEC-1877 |
Commit 59 uncommitted files (17 modified + 42 untracked) |
Critical |
done |
Senior Backend Engineer |
Wave 11B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1878 |
Investigate and unblock E2E test environment (TEC-1652) |
High |
todo |
DevOps Engineer |
| TEC-1547 |
E2E Integration Verification — Full MVP Happy Path |
High |
cancelled |
QA Engineer (duplicate of TEC-1652) |
| TEC-1847 |
Add React component tests (RTL) for critical components |
Medium |
todo |
QA Engineer |
Wave 11C — Medium Priority (P2) — Carryover
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1842 |
Refactor Agents/Inquiries/Leads/Reviews to full DDD |
Medium |
in_progress |
Architect |
| TEC-1777 |
Implement agent quality score auto-calculation cron |
Medium |
todo |
Senior Backend Engineer |
| TEC-1776 |
Refactor 3 oversized files exceeding 220 LOC |
Medium |
todo |
Senior Backend Engineer |
| TEC-1740 |
DTO validation hardening — phone, password, email |
Medium |
todo |
Senior Backend Engineer |
Wave 11D — CEO Full Audit Subtasks (2026-04-11)
Parent task: TEC-1882 — GoodGo Platform AI CEO Audit
Wave 11D-Critical — Fix Build Pipeline (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1888 |
Fix 725 ESLint errors and TypeScript compilation errors in web |
Critical |
todo |
Senior Frontend Engineer |
| TEC-1889 |
Fix 27 failing rate limit guard unit tests in shared module |
Critical |
todo |
Senior Backend Engineer |
Wave 12 — Module Completion (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1890 |
Complete 3 incomplete API modules (health, metrics, MCP) |
High |
todo |
Senior Backend Engineer |
| TEC-1891 |
Implement production MCP servers (search, analytics, valuation) |
High |
todo |
Senior Backend Engineer |
Wave 13 — Quality & Security (P1-P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1892 |
Expand web component unit tests to 50% coverage |
High |
todo |
Senior Frontend Engineer |
| TEC-1893 |
Implement field-level encryption for PII and payment data |
High |
todo |
Security Engineer |
| TEC-1894 |
Add TOTP-based MFA support for agent and admin accounts |
Medium |
todo |
Security Engineer |
Wave 12 — CEO Audit (2026-04-11) — CI Pipeline Fix
Parent task: TEC-1895 — GoodGo Platform AI
Wave 12A — Fix CI Pipeline (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1898 |
Fix Prisma 7 migration: replace $use() middleware with $extends |
Critical |
done |
Senior Backend Engineer |
| TEC-1899 |
Fix 31 failing unit tests (rate-limit guards + auth repo) |
Critical |
done |
QA Engineer |
| TEC-1900 |
Fix 4 ESLint errors and commit 91 uncommitted files |
Critical |
done |
Senior Backend Engineer |
Wave 12B — Bug Fixes & Feature Completion (P1) — Carryover
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1649 |
Fix login endpoint returning 500 instead of 401 |
High |
done |
Senior Backend Engineer |
| TEC-1657 |
Add audit logging for admin actions |
High |
todo |
Senior Backend Engineer |
| TEC-1878 |
Investigate and unblock E2E test environment |
High |
todo |
DevOps Engineer |
| TEC-1847 |
Add React component tests (RTL) for critical components |
Medium |
todo |
QA Engineer |
Wave 13 — CEO Audit (2026-04-12) — Automated Routine
Parent task: TEC-1915 — Goodgo Platform AI
Wave 13A — Critical (P0)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1918 |
Fix 7 TypeScript compile errors in web test files — add vitest types |
Critical |
done |
Senior Backend Engineer |
Wave 13B — High Priority (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1919 |
Unblock E2E test environment and run full MVP happy-path tests |
High |
todo |
DevOps Engineer |
| TEC-1920 |
Backlog grooming — deduplicate and close resolved issues |
High |
done |
QA Engineer |
| TEC-1921 |
Complete /pricing page — connect subscription plans to checkout |
High |
todo |
Senior Frontend Engineer |
Wave 13C — Medium Priority (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1922 |
Create formal production readiness checklist and sign-off |
Medium |
todo |
SRE Engineer |
| TEC-1923 |
Update PROJECT_TRACKER.md with Wave 13 audit results |
Medium |
done |
Technical Writer |
Wave 14 — CEO Audit (2026-04-12) — ✅ Build Green
Parent task: TEC-1970 — Goodgo Platform AI
Build Status: ALL GREEN
pnpm typecheck — 0 errors (3 packages)
pnpm lint — 0 errors (after fixing 1 import order issue)
pnpm test — 232 test files, 1454 tests all passing
pnpm build — successful (API + Web + MCP servers)
Platform Stats
- 812+ TypeScript files in API (13 complete DDD modules)
- 89 React components, 28 routes in frontend
- 22 Prisma models, 16 migrations
- 333 test files total (232 unit, ~31 E2E + others)
Wave 14A — ESLint Fix (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1971 |
Commit ESLint import order fix in postgres-search.repository.ts |
High |
done |
Senior Backend Engineer |
Fix committed in 836499c.
Wave 14B — Backlog Cleanup (P1)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1972 |
Close resolved issues and clean up backlog |
High |
in_progress |
QA Engineer |
Wave 14C — Documentation (P2)
| Issue |
Title |
Priority |
Status |
Assignee |
| TEC-1973 |
Update PROJECT_TRACKER.md with Wave 14 CEO audit results |
Medium |
done |
Technical Writer |
Wave 14 — Remaining Open Issues (5 total — 0 critical, 3 high, 2 medium)
All non-blocking for production readiness.
| Issue |
Title |
Priority |
Status |
Category |
| TEC-1650 |
Fix Listing detail — non-existent ID returns 500 → 404 |
High |
todo |
Bug Fix |
| TEC-1652 |
Run and verify all 29 E2E tests with full environment |
High |
todo |
Quality |
| TEC-1657 |
Add audit logging for admin actions |
High |
todo |
Security |
| TEC-1776 |
Refactor 3 oversized files exceeding 220 LOC |
Medium |
todo |
Code Quality |
| TEC-1777 |
Implement agent quality score auto-calculation cron |
Medium |
todo |
Feature |
Summary
| Phase |
Total |
Done |
In Progress |
Blocked |
Todo |
Cancelled |
| Phase 0 |
6 |
6 |
0 |
0 |
0 |
0 |
| Phase 1 |
8 |
8 |
0 |
0 |
0 |
0 |
| Phase 2 |
5 |
5 |
0 |
0 |
0 |
0 |
| Phase 3 |
4 |
4 |
0 |
0 |
0 |
0 |
| Phase 4 |
8 |
8 |
0 |
0 |
0 |
0 |
| Phase 5 |
4 |
4 |
0 |
0 |
0 |
0 |
| Phase 6 |
16 |
16 |
0 |
0 |
0 |
0 |
| Phase 7 |
108 |
97 |
1 |
0 |
5 |
5 |
| Total |
159 |
148 |
1 |
0 |
5 |
5 |
Note: 5 issues cancelled (TEC-1547, TEC-1876, TEC-1877 + 2 others). Counts sourced from Paperclip issue tracker on 2026-04-12.
Last updated by Technical Writer — 2026-04-12 (Wave 14 CEO audit: build green, backlog cleanup by QA Engineer)